Thanks to all of you who pitched in!
The tiles are all installed (except the last 2 custom cuts). I need to put the slide back on, and hook the swing up, and bolt the monkey bars on. So, 2 bolts, 4 nuts, and 2 tiles.
I might even get this done before my buisness trip tomorrow. I really hope so.
Today's been a rough day. Server problems again have put me in a down mood that is susceptible to Doug downturns. Pray for the cloud to be lifted from my mood so I can enjoy the kids before I fly off...